Uşak Tabakhane Region Urban Transformation Project

Date Start 09 July 2008
Date End 30 November -1

İlgili: Kentsel Dönüşüm , Kentsel Yenileme, Gayrimenkul Değerleme ve Mimarlık hakkında bilgi.

 

Uşak Tabakhane Region Urban Transformation Project

Location

Uşak

Project

Owner

Uşak Municipality

Start Date

09 July 2008

Explanation

Uşak Municipality Tabakhane Region Urban Transformation Project

Urban Transformation Project includes totally a 91.07 ha area which is in the city center of Uşak, in Tabakhane region and range with the Ankara-İzmir ( E-96) highway. The urban transformation area consists of the factory buildings which were vacated by leather firms and most of them are empty and worn-out. The detail survey including the whole area is complete.  Arrangement of urban transformation concept , arrangement of pre urban design and after that first round contract negotiations were done for the 43.61 ha first stage determined by TOKİ. %50 of the consent contracts were signed as of March. In parallel with the arranged pre urban design project; 968 dwellings and 882 trade units have been positioned.

 

Work Items In The Project Scope

Last Status

Arrangement Of The Expropriation, Detail Survey and Valuation Reports

Complete

1/1000 Urban Design Project

Being Revised

Information, Coordination and Arrangement of the Main Papers of the Agreement

Complete

Signing Contracts With Rightful Owners

Continuing

Area Information

Project Area

91.1 ha

Number Of Shares

1299

Number Of Buildings

511

Number Of Detached Units

1561

Use Of Building

Factory-Commercial Office-Store-Dwelling

Number Of Storeys

1-7

Building Type

Reinforced Concrete -Masonry