Consulting and Controllership Work of Bringing Water from Kesikköprü Dam to the Ankara İvedik Water Treatment Plant

Date Start 23 July 2007
Date End 23 December 2007

İlgili: Kentsel Dönüşüm , Kentsel Yenileme, Gayrimenkul Değerleme ve Mimarlık hakkında bilgi.

 

Consulting and Controllership Work of Bringing Water from Kesikköprü Dam to the Ankara İvedik Water Treatment Plant

Location

Ankara

Project Owner

ASKİ

Start Date

23 July 2007

End Date

23 December 2007

Explanation

Consulting and Controllership Work of Bringing Water from Kesikköprü Dam to the Ankara İvedik Water Treatment Plant

Topographic measurements, application and mapping works of the steel and GRP water transmission pipelines (383.8 km in total) laid in the scope of the work of bringing water from the Kesiköprü Dam to the Ankara İvedik Water Treatment Plant, pumping stations and water tanks. Moreover, test controls of main pipe sources have been done in the same work scope.

Project Information

Total Pipe Length

383.8 km

Number Of Tanks

10 pieces

Number Of Pumps

5 pieces

Number Of Vacuum Lifters

168 pieces

Number Of Waste ways

114 pieces

Steel Line Length

204.8 km

GRP Line Length

179.0 km

Number Of Source-Checked Steel Gaskets

11749 pieces

Checked Steel Line Length

159 km